Energy & Recycling

We are moving towards a greener future. The energy industry is replacing fossil fuels with renewable energy,
and biofuel derived from biomass such as plant, algae material, and animal waste plays an important part in this transformation. Also, the recycling industry is growing. Waste is turned into new products to minimize the
use of new resources.

Lachenmeier Monsun has been a part of this journey from the very beginning. When some of the first wood
pellet factories were built in the beginning of this century, Lachenmeier Monsun supplied the conveyors. Soon after, we started to design conveying plants and storage plants for power plants. Today, solutions for biofuel make out a major part of our business.

Solutions

A wide range of our products and solutions within conveying, dust aspiration, and storage are specially designed to meet the demanding needs of the energy and recycling industry. The products are built to perform, last, and transport as much as 1500 tons per hour. Every hour, 365 days a year. A lot of companies within the energy industry are met with societal obligations relating to safety, environmental impact, and limitation of dust. Our solutions take all these factors into consideration. At Lachenmeier Monsun, we have many years of experience and knowledge in designing solutions that minimize both fire and explosion hazards, and we have our very own product range within dust aspiration.

Cases

ØRSTED AVEDØRE

Scope of Delivery: Increase storage capacity
Equipment Used: Storage

DONG Energy Avedøre in Copenhagen has
built a new round silo in concrete being able
to store 100.000 m3of wood pellets. The new
silo has extendedthe existing storage capacity
by 4-5times. The silo receives wood pellets
fromtheir internal port where ships andbarges
are unloaded. The wood pellets areconveyed
from the new silo to the boilerhouse.


READ MORE

ØRSTED STUDSTRUP

Scope of Delivery: Intake system and storage
Equipment Used: Intake, Storage
Year: 2011

Lachenmeier Monsun together with partners:
Persolit A/S and Danpro Steel Construction A/S
provided the solution for the transport of wood
pellets from ship to storage silo with a capacity
of 1.000 t/h. The total silo capacity is 100.000
m3. Transportation of bulk material from the
storage silo to the day silo has a capacity of
300 t/h. The power plant in Studstrup uses
wood pellets for energy generation as an
alternative to coal.


READ MORE

AVA - LISBJERG

Scope of Delivery: Project Management
Equipment Used: Conveying, Cleaning, Aspiration
Year: 2016/2017

Lachenmeier Monsun was asked to provide
a solution for the transport of wood chips as
the AVA is expanding their main incineration
of waste to include biomass – primarily straw.
To provide an economic and reliable operation,
AVA has chosen a backup solution of wood
chips in case of problems with supply of straw.
The power plant can deliver up to 50% wood
chips.


READ MORE

Selected products

Our customers say

"I very much appreciate the organized work done on developing the specification and delivery of equipment, as well as the quality of its execution. The price/quality ratio is very well balanced, and the equipment looks very aesthetic too."

Pankov

Technical Director - OOO Agropromstroy

Our customers say

"We would like to thank Lachenmeier for the uncomplicated and good advice during planning and realization of the project. The 1000 t/h conveyor is performing to our full satisfaction, the low power consumption in connection with the heavy industrial design, made the decision to choose Lachenmeier Monsun very easy."

Sven Sörensen

Geschäftsführerg.T.H. Getreide Terminal Hamburg Gmbh & Co. Kg

Our customers say

“We have cooperated with Lachenmeier Monsun since 2003, where the first intake systems where designed, produced and installed in Kalundborg by Lachenmeier Monsun. A cooperation that has truly developed along with the expansion of the Dan Store Terminal in 2011/2012”

Simon Rodian Christensen

Copenhagen Merchants

Our customers say

”Lachenmeier Monsun is a trusted partner in the construction process - represented by professionals, who promptly answered all of our questions, and provided technical solutions that met all our requirements."

Victor Perunko

Technical Engineer - Private Enterprise Oliyar

Our customers say

”This has been a very exciting project to us. In order to ensure the best possible solution, we have co-operated closely with Lachenmeier Monsun from time of greenfield until final installation. And I feel confident that the best possible solution is exactly what we have achieved.”

Torben Madsen

General Manager

Our customers say

”We receive grain at 300 tons per hour and we are able to take out up to 600 tons per hour. That was the main requirement for our silo system and that requirement has been fullfilled. In the end we found that the solution from Lachenmeier Monsun was the most attractive one, both design-wise, functionality-wise and also cost-wise. So in the end the choice was actually easy for us.”

Klaus G. Andersen

Owner and Managing Director - Fredericia Bulk Terminal