Lachenmeier Maskinfabrik A/S can offer to assist a Builder in designing a new plant. 

The development of a project can be split in 2 phases:    
    Phase 1 - Scheme design
    Phase 2 - Quotation design

Phase 1 - Scheme Design

The purpose of the scheme design is a fundamental description of the project with selection of main machines and preparation of budgetary prices. A scheme design would typically involve:

   Preparation of flow diagrams and sketches for the most 
     important machine placements.
   Laying down and calculations of optimum outputs and  

    capacities.
   Ivaluation of the project with preferred supplier of
    process machines for selection of machine sizes.
   Preparation of preliminary machine and component lists.
   Preparation of framework schedule for the project.
   Evaluation of the project with the client and succeeding

     revisions.
   Preparation of project description and calculation of budgetary price.

Phase 2 - Quotation Design

A complete plant at a fixed price and a fixed time
The purpose of the quotation design is to dimension and specify the choice of equipment and components including service equipment for a complete plant. A real quotation design would typically involve:


   Preparation of arrangement drawings specially thinking of  
    foundations and necessary building adjustments.
   Arrangement drawings of machinery tower, silo tower, intake,
    discharge, aspiration plant etc. in order to determine static
    loads and thereby the dimensioning basis for the foundations.
  Co-ordination with suppliers of controls and wiring in case
    Lachenmeier Maskinfabrik A/S is not total supplier.
  Preliminary negotiations with sub-suppliers of big components
    with reference to obtaining the most favourable price and
    conditions for the Builder.
   Investigation of energy, fire, and environmental requirements.
   Preparation of time schedules.
   Preparation of final quotation.

 

The customer will establish a project group including a co-ordinator to whom Lachenmeier Maskinfabrik A/S will refer to.

The advantages that the customer obtains with Lachenmeier Maskinfabrik A/S as partner

Lachenmeier Maskinfabrik A/S carries out the physical part of the design and ensures that the project is complete and that information is distributed to the right recipients. With that the Builder has entrusted this part to a company with a broad experience in this kind of projects. At the same time the Builder’s resources for the total project are released.

All suppliers of various equipment and components, that apply to the Builder after the announcement of the project, can be referred direct to Lachenmeier Maskinfabrik A/S, who will sort the applications and submit the various proposals to the Builder. Thereby the Builder can avoid spending unnecessary time on - often - many applications.

The sub-suppliers that the Builder already uses, or the areas in which the Builder has specific component requirements, as regards future servicing as an example, can be involved in the project upon wish.

The Builder and Lachenmeier Maskinfabrik A/S get a very exact basis for calculation of the project price ensuring that the Builder gets a complete project at a fixed price and a fixed time. Participation from the various suppliers at an early stage of the project secures that there will be no renunciation of responsibility later in the course.

Lachenmeier Maskinfabrik A/S invites offers and solution proposals from several relevant suppliers of process machines. The proposals will be presented to the project group who will then choose among the proposals. This ensures that the Builder gets all the negotiation advantages.

The changes occurred to the project in the period from scheme design to the final project are described and priced. This means that the Builder can follow the financial consequences of the changes occurred, precisely.

A well done preliminary work among competent parties in a new building project will ensure the completion of an optimum project for all the parties in the project. An optimum project containing complete, liable, thought-through solutions at a fixed price and a fixed time.
System15 306
System23 306

Case:

Pellets Intake at DONG Energy Herning - Denmark

MONSUN Lachenmeier designs total projects and supplies specialized technology for transport, loading and storage systems for biomass fuels such as, finely granulated lightweight materials, sawdust, fines, cut straw, bark and wood pellets.

Lachenmeier Maskinfabrik A/S • Grundtvigs Allé 176 • 6400 Sønderborg • Danmark • Tel.: +45 7442 2464